Initiative Taken
1) Implementation of e-Governance in this Municipality has already been started.
2) Implementation of Single Window System X-clusively for e-Governance programme.
3) Implementation of e-Filing as soon as possible.
4) Construction of 2nd Electric Crematorium has already been started.
5) Work is going on for the Construction of Community Hall cum Training Center near Subhas Uddyan.
6) Work is going on within Municipal premises for the construction of New Administrative Building.
7) Door-to-door collection of Waste Disposal is going on rapidly.
8) Beautification of River Front Development work near Jhoutala Ghat is going on.
9) Placing of statue ( made of bronze ) of Sahid Khudiram Bose in ward no. 12, Poet Kazi Nazrul Islam in ward no. 17, Dr. B. C. Roy within Municipal Hospital Premises, Acharya Jagadish Chandra Bose and Poet Sukanta Bhattacharya within Municipal Office Premises had already
been completed.
10) Around 9 Cr. Scheme had been sent to the Govt. for the development of Minority concentrated area and from this scheme Rs. 88.70 Lacks had already been approved by Govt. for the construction of Black Top road.
11) A scheme containing construction of 450 Nos. pour flush latrine for the poor sent to the Govt. for approval.
12) Rs. 32.76 Cr. has been approved by Govt. under BSUP Ph-II.
13) Work is going on for the Sewerage Treatment Plant ( STP ) rapidly.
14) A master plan has been prepared for the huge changes of the drainage system of Budge Budge Municipal area and this scheme is pending for the approval of the Govt.
15) Rs. 39 Lacks has already been approved by the Govt. for the construction of Community Hall for Minority on the 1st Floor of Silver Jubilee School.
16) A project has been approved by the State Govt. for the construction of Urdu School in ward no. 17 on the Golam Rosul Road and this land has been donated by this Municipality.
17) An approval has been received from KUSP for the construction of Readymade Production Hub on the 2nd floor of Municipal Administrative Building with the project cost of Rs. 12.28 Lacks.
18) 100% coverage of SWM service to the Citizens.
19) 100% Water Supply, Drainage and Sanitation Coverage
20) One 24 x 7 Water Supply Scheme with one U.G.R. and 6 Nos. E.S.Rs under JNNURM amounting to Rs.81.6412 Crore have been sanctioned for Budge Budge Municipality and is scheduled to be completed by March-2011, wherein 100% Metering is proposed and Water Charges at the following rates is to be levied from each and every holding having Water Connection.
Domestic Holdings below poverty level @ Rs.1.50/K.L.
Domestic Holdings (General) @ Rs.3.50/K.L.
Industrial & Commercial Holdings @ Rs.18.00/K.L.
So it is assured that immediately after completion of the project mentioned above, 100% Holdings having Water Connection will come under the perview of Water Charges.